Commissioning Procedure

Preliminary Set-Up

A. Ensure the work area is clean and tidy. Pathways to main disconnect

and emergency stop push-button must be clear and unobstructed.

B. The following test equipment is to be prepared for use:

Test power supply, supplied with each controller

Multimeters

Hi-Pot Tester (recommended) or Megger

Oscilloscope with memory (optional)

C. Complete drawing package and parts list.

D. Specification of project.