Chapter 2 installation procedure, Port 1 terminal block ■ connecting melsec-a series – KEYENCE N-400 User Manual

Page 22

Advertising
background image

Chapter 2 Installation Procedure

14

2

Connecting KV series/Handheld programmer port

Use the optional cable manufactured by KEYENCE.

Connecting KV-L2

1.

Port 1

Terminal block

Connecting MELSEC-A series

SD

RD

SD

TERMINATOR

RD

CS

RS

TEST

RS-232C

RS-455

POWER TIMING

N-400

ON

OFF

OP-96369

OP-24045 (1 m)
or
OP-24025 (5 m)

KV-10, 16, 24
KV-40, 80

KV-300

1.

2

KV-L2

SD

RD

RS

CS

DR

SG

ER

3

4

5

6

2

1

1

N-400

SD

FG

FG

RD

SG

RS

CS

DR

ER

3

4

5

6

7

20

7

20

D-sub 25-pin (male)
M2.6 screw

D-sub 25-pin (male)
M2.6 screw

5

KV-L2

RD

SG

2

1

3

N-400

SD

FG

SD

RD

RS

CS

DS

ER

SG

3

4

5

6

20

7

1

D-sub 25-pin (male)
M2.6 screw

Terminal block

* The OP-98769 cable (1.5 m: manufactured

by KEYENCE) or a commercially-available
straight cable can be used.

Connection with AJ71C24, AL71C24-S*,
A0J2-C214S1, AJ71UC24

Connection with A1SJ71C24-R2/PRF,
A2CCPUC24, A2CCPUC24-PRF,
A1SJ71UC24-R2/PRF

2

SD

RD

RS

CS

DR

SG

CD

3

4

5

6

2

1

1

N-400

Link unit

SD

FG

FG

RD

RS

CS

DR

SG

ER

ER

3

4

5

6

7

8

7

8

20

20

D-sub 25-pin (male)
M2.6 screw

D-sub 25-pin (male)
M2.6 screw

2

Link unit

SD

CD

RD

RS

CS

DR

SG

ER

3

4

5

6

2

1

N-400

SD

FG

RD

SG

RS

CS

DR

ER

3

4

5

6

7

8

7

8

20

1

D-sub 25-pin (male)
M2.6 screw

D-sub 25-pin (male)
M2.6 screw

Connector case

1. KV-300 and KV-L2 are not available in Europe.

1. KV-300 and KV-L2 are not available in Europe.

Advertising