Installation – Glow-worm Ultracom2 35 Store User Manual

Page 15

Advertising
background image

0020112185_PROTO_13 - 01/11 - Glow-worm

- 13 -

3

2

1

3

2

1

4

8

9

7

5

7

6

5

Key

1 Heating flow circuit

2 Heating return circuit

3 boiler

4 Double check valve assembly

5 Domestic cold water supply in

6 Temporary filling loop (remove immediately after filling)

7 Drain point

8 back flow prevention device

9 Tundish

The system should be pressurised to 0.8bar, indicated on the

digital display with no heating demand.

Drain points

Drain taps must be provided at all low points of the system, which

will allow the entire system to be drained.

Drain taps shall be to the current issue of BS2879.

Water treatment

Existing system- It is essential that prior to installing the new

boiler the system is thoroughly flushed.

New system- For optimum performance after installation, the

boiler and its associated central heating system should also be

flushed.

Flushing shall be carried out in accordance with BS 7593, a

chemical cleanser can be used either Sentinel X300, X400 or

Fernox F3 are suitable.

It is recommended to flush existing systems first before fitting the

new boiler.

• Ensure all cleanser is removed from the whole system before

adding an inhibitor.

For long-term corrosion protection after flushing, an inhibitor

suitable for stainless steel heat exchangers can be used. Either

Sentinel X100 or Fernox F1 inhibitor can be used.

Artificially softened water- BS7593 notes that soft water has

an increased potential for corrosion and this may influence the

choice of corrosion inhibitor. Where water is artificially softened,

it is advisable to feed unsoftened water to drinking water taps.

The boiler primary circuit should only be filled with unsoftened

water.

7.3

Dimensions

470

561

361

890

100

=

=

INSTALLATION

Advertising