Installation, 8 hydraulic connection – Glow-worm Ultracom2 35 Store User Manual

Page 17

Advertising
background image

0020112185_PROTO_13 - 01/11 - Glow-worm

- 15 -

7.4.2

boiler hanging

a

With regards to the Manual Handling Operations,

1992 Regulations, the following lift operation exceeds

the recommended weight for a one person lift, refer to

chapter "Manual Handling".

2

1

Key

1 boiler

2 Hanging bracket

• Lifting the boiler into position, lean the top of the boiler

slightly to the wall and position just above the hanging

bracket.

• Lower the boiler slowly and engage onto the hanging bracket

8 Hydraulic connection

8.1

Gas and water connections

The whole of the gas installation, including the meter, should be

inspected, tested for tightness and purged in accordance with the

current issue of BS6891 and in IE the current edition of I.S.813

“Domestic Gas Installations”.

i

The appliance may contain a small amount of water,

place a water container beneath the boiler connections.

• Take care to clean the pipes before assembly removing any

debris or burrs. Grease and oils may need to be removed they

are not possible to remove by cleansing and flushing. Foreign

bodies in the system may enter the appliance and interrupt its

operation.

• Do not use any solvent products, due to the risk of damaging

the circuit.

a

Do not perform any 'hot work' directly under the

appliance, this may cause damage to the appliance

base. Heat may also damage the isolation valves.

Always pre-assemble pipes before fitting them to the

boiler.

• Only use original seals supplied with the appliance.

• Check that there are no leaks. Repair if necessary.

1

2

3

4

5

7

6

Key

1 Gas service isolating valve with pressure test point + sealing washer

½"

2 Domestic hot water outlet isolating valve + sealing washer ¾"

3 Heating flow isolating valve + sealing washer ¾"

4 Cold water inlet isolating valve + sealing washer ¾"

5 Heating return isolating valve + sealing washer ¾"

6 Connection Ø O.D. 22 mm

7 Gas connection Ø O.D. 15 mm

• Use only the original gas cock GER/1 DN15, CE-0085 CL 0082

• Use only the olive and flat seal washer supplied with the gas

cock.

INSTALLATION

Advertising