Timing verification – Basler Electric BE1-11g User Manual

Page 420

Advertising
background image

408

9424200994 Rev N

Step 2: Use BESTCOMSPlus to configure the BESTlogicPlus programmable logic shown in Figure 285.

Blocking is disabled.

OUT1 closes for 59P-1 Trip.

OUT2 closes for 59P-1 Pickup.

Fault recording is enabled.

Figure 285. BESTlogicPlus Settings

Step 3: Use BESTCOMSPlus to open the Protection, Voltage, Overvoltage (59P-1) screen and send

the first row of test settings in Table 155 to the BE1-11g.

Table 155. Pickup Test Settings

Pickup Setting

Time Delay

245 V

50 ms

125 V

50 ms

75 V

50 ms

Step 4: Prepare to monitor the 59P-1 function operation. Operation can be verified by monitoring OUT2

(see Figure 285).

Step 5: Connect and apply a 240 Vac, three-phase voltage source to terminals C13 (A-phase), C14 (B-

phase), C15 (C-phase), and C16 (Neutral).

Step 6: Slowly increase the A-phase voltage until OUT2 closes and record the pickup. Verify that there

is a 59P-1-A target on the front-panel display. Slowly decrease the A-phase voltage until OUT2
opens and record the dropout. Reset the target.

Step 7: Verify the pickup and dropout accuracy at 120 Vac for a pickup setting of 125 V and 70 Vac for

a pickup setting of 75 V as listed in Table 155. Record the results.

Step 8: (Optional.) Repeat steps 1 through 7 for the B-phase and C-phase voltage inputs. Note: Be sure

to enable proper target for each phase being tested.

Step 9: (Optional.) Repeat steps 1 through 8 for settings group 1, 2, and 3.

Step 10: (Optional.) Repeat steps 1 through 9 for 59P-2, 59P-3, and 59P-4.

Timing Verification

Step 1: Use BESTCOMSPlus to open the Protection, Voltage, Overvoltage (59P-1) screen and send

the first row of test settings in Table 156 to the BE1-11g for settings group 0.

Table 156. Timing Test Settings

Pickup Setting

Time Delay

125 V

2,000 ms

125 V

5,000 ms

125 V

10,000 ms

Phase Overvoltage (59P) Test

BE1-11g

Advertising