424

9424200994 Rev N

Step 2: Use BESTCOMSPlus to configure the BESTlogicPlus programmable logic shown in Figure 291.

Blocking is disabled.

OUT1 closes for 78V Trip.

OUT2 closes for 78V Pickup.

Fault recording is enabled.

Figure 291. BESTlogicPlus Settings

Step 3: Use BESTCOMSPlus to open the Protection, Voltage, Vector Jump (78V) screen and send the

first row of test settings in Table 173 to the BE1-11g.

Table 173. Pickup Test Settings

Pickup Setting

20

°

90

°

Step 4: Prepare to monitor the 78V function operation. Operation can be verified by monitoring OUT1

(see Figure 291).

Step 5: Connect and apply a three-phase 120 V phase-phase voltage source to terminals C13 (A-

phase) and C16 (Neutral).

Step 6: Apply a ±20 degree step change to the A-phase voltage angle. Verify OUT1 closes and record

the pickup. Verify that there is a 78V target on the front-panel display. Total time to trip should
be 150 ms or less. Remove the A-phase voltage angle. Verify that OUT1 opens and record the
reset. Reset the target.

Step 7: Verify the pickup accuracy and reset for a pickup setting of 90

° as listed in Table 173. Record

the results.

Step 8: (Optional.) Repeat steps 1 through 7 for settings group 1, 2, and 3.

Functional Test Report

Pickup Verification

Pickup Setting Range = 2 to 90

°

Pickup Accuracy =

±1°

Step

Pickup Setting

Low

Actual Pickup

High

Pass/Fail

6

20

°

19

°

21

°

P / F

7

90

°

89

°

91

°

P / F

Vector Jump (78V) Test

BE1-11g