Comtech EF Data CST-5000 User Manual

Page 41

Advertising
background image

CST-5000 C-Band Satellite Terminal

Single Thread System Installation

Rev. 9

2–13

5. Install the threaded rods as follows:

a. Install two spring nuts in both 14”

unistruts mounted on the RFT.

Note: Ensure the spring nuts are

positioned over the outer holes in the
14 inch (35.6 cm) unistruts, as
illustrated.









b. To install each spring nut:

(1) Place the spring nut in the

unistrut channel, spring side
down, with its wide side parallel
with the unistrut channel.


(2) Press down on the spring nut to

compress the spring, and rotate
the nut 90

° (i.e., perpendicular to

the unistrut).


(3) Release pressure on the spring nut.

(4) Repeat Steps 5.b.(1) through 5.b.(3) for each spring nut.


c. Thread a 5/16-20 nut approximately 1-1/2 inch (1.27 cm) onto each threaded

rod. (This will ensure that the threaded rods will extend beyond the spring
nuts when installed.)


d. Place a 5/16 inch (8 mm) split lockwasher, 5/16 inch (8 mm) flat washer, and

flat fitting plate over each threaded rod.

Advertising