Terminal default conditions, Theory of operation, 1 remote interface specification – Comtech EF Data CST-5000 User Manual

Page 93: 3 terminal default conditions, 4 theory of operation

Advertising
background image

Theory of Operation

CST-5000 C-Band Satellite Terminal

5–4

Rev. 9

5.1.2.1 Remote Interface Specification

Refer to Appendix B for information on remote control operation.

5.1.3 Terminal Default Conditions

On initial power-up, the unit will default to the following parameters:

Parameter

Default

Baud Rate

9600

Parity Even
Device Address

1

U/C Gain

Minimum

D/C Gain

Minimum

RF Output

OFF

U/C Frequency

6135.00 MHz

D/C Frequency

3925.00 MHz

5.1.4 Theory of Operation

Refer to Figure 5-3 for a functional block diagram of the M&C.

The M&C board performs the following operations:

• Receives the desired frequency from either the remote EIA-232/485 or local

keypad, and after converting it to a synthesizer setting, stores it to the applicable
synthesizer output latch.


• Reads the thermistors located in the up converter, down converter, and HPA, and

converts the signals into temperatures for display.


• Reads the characterization EEPROMs in the up converter, down converter, and

HPA, and calculates an Automatic Gain Control (AGC) voltage based on
frequency and temperature to linearize the respective module.


• Turns the fan on or off, depending on the temperature.

• Receives fault inputs from all modules, and presents them to the remote

EIA-232/485 and the optional local keypad display.


• Performs an initial current sense on the LNA, and stores the reading in the

EEPROM. Subsequent current sense readings are taken and compared to the
initial reading to determine a fault.

Advertising