Spar installation, 3 spar installation – Comtech EF Data CST-5000 User Manual
Page 45
![background image](/files/778811/content/doc045.png)
CST-5000 C-Band Satellite Terminal
Single Thread System Installation
Rev. 9
2–17
2.3.3 Spar Installation
Note: The following process is for a typical installation. Custom systems may be ordered,
and are beyond the scope of this manual.
To install the RFT to a spar:
1. Set the unit on its side, with the mounting holes facing up.
2. Install the 8 inch (20.3 cm) unistruts as follows:
a. Position an 8 inch (20.3 cm) unistrut
(with the open side facing up) over
one set of the mounting holes on the
RFT.
b. Using four 1/4-20 x 1 inch bolts, 1/4
inch (6 mm) split lockwashers, and
1/4 inch (6 mm) flat washers, attach
an 8 inch (20.3 cm) unistrut to the
RFT.
Tighten the bolts firmly.
c. Repeat Steps 2.a. and 2.b. for the
second 8 inch (20.3 cm) unistrut.