Single Thread System Installation
CST-5000 C-Band Satellite Terminal
2–18
Rev. 9
3. Mount the RFT as follows:
a. Position a spring nut between the
inner and outer bolts on both sides
of each 8 inch (20.3 cm) unistrut,
as illustrated.
b. Install each spring nut as follows:
(1) Place the spring nut in the
unistrut channel, spring side
down, with its wide side
parallel with the unistrut
channel.
(2) Press down on the spring nut
to compress the spring, and
rotate the nut 90
° (i.e.,
perpendicular to the unistrut).
(3) Release pressure on the spring
nut.
(4) Repeat Steps 3.b.(1) through
3.b.(3) for each spring nut.
c. Lift the RFT into position.
d. Using four 5/16-18 bolts, 5/16”
li l k
h
d 5/16” fl