Lna installation – Comtech EF Data CST-5000 User Manual

Page 46

Advertising
background image

Single Thread System Installation

CST-5000 C-Band Satellite Terminal

2–18

Rev. 9

3. Mount the RFT as follows:

a. Position a spring nut between the

inner and outer bolts on both sides
of each 8 inch (20.3 cm) unistrut,
as illustrated.




















b. Install each spring nut as follows:

(1) Place the spring nut in the

unistrut channel, spring side
down, with its wide side
parallel with the unistrut
channel.

(2) Press down on the spring nut

to compress the spring, and
rotate the nut 90

° (i.e.,

perpendicular to the unistrut).

(3) Release pressure on the spring

nut.


(4) Repeat Steps 3.b.(1) through

3.b.(3) for each spring nut.

c. Lift the RFT into position.

d. Using four 5/16-18 bolts, 5/16”

li l k

h

d 5/16” fl