Load Planning

Load planning provides a graphical overview of the scheduled time periods in which the active loads
must be operated (dark-colored bars) or can be operated (light-colored bars).

"Name of the Load"

You can access the tab Name of the load by going to the Load overview and planning page,
Load overview area, and selecting the Configuration button [

] in the line of the required load.

On the tab Name of the load, you can configure the properties of the load and time periods for the
load. Depending on the selected load type, you can display and configure different load properties
on the tab page (see Section 9.3, page 65).

6.8.5 Report Configuration

This page displays whether you have configured any reports to be e-mailed by Sunny Portal, and if
so which report types (see Section 11.3 "Reports", page 89).

6.8.6 User Management

Requirements for displaying the page:

☐ You must have the user role Installer or PV system administrator (see Section 13 "User

Management", page 108).

This page displays all users created for the Sunny Home Manager system (see Section 13.2
"Creating a New User", page 109)
. You can also edit previously created users and, for example,
change the user roles or delete users.

F

Status

Status of the load

=

OK
Load is fully configured and receives data

=

Not active
Load is not assigned to any SMA radio-controlled socket

=

Load is not fully configured

G

Configuration

Opens the tab "Name of the load", on which you can configure
the load properties (see Section 9.3, page 65).

Position

Designation

Explanation