PLANET WGSW-28040P User Manual

Page 112

Advertising
background image

User’s Manual of WGSW-28040 / 28040P / 28040P4

112

The scenario described as follow:

Untagged packet entering VLAN 2

1.

While [PC-1] transmit an untagged packet enters Port-1, the Managed Switch will tag it with a VLAN Tag=2.

[PC-2] and [PC-3] will received the packet through Port-2 and Port-3.

2.

[PC-4],[PC-5] and [PC-6] received no packet.

3.

While the packet leaves Port-2, it will be stripped away it tag becoming an untagged packet.

4.

While the packet leaves Port-3, it will keep as a tagged packet with VLAN Tag=2.

Tagged packet entering VLAN 2

1.

While [PC-3] transmit a tagged packet with VLAN Tag=2 enters Port-3, [PC-1] and [PC-2] will received the packet

through Port-1 and Port-2.

2.

While the packet leaves Port-1 and Port-2, it will be stripped away it tag becoming an untagged packet.

Untagged packet entering VLAN 3

1.

While [PC-4] transmit an untagged packet enters Port-4, the switch will tag it with a VLAN Tag=3. [PC-5] and

[PC-6] will received the packet through Port-5 and Port-6.

2.

While the packet leaves Port-5, it will be stripped away it tag becoming an untagged packet.

3.

While the packet leaves Port-6, it will keep as a tagged packet with VLAN Tag=3.

At this example, VLAN Group 1 just set as default VLAN, but only focus on VLAN 2 and VLAN 3 traffic

flow

Setup steps

1. Create VLAN 2 Group

Add VLAN Group 2 with VID=2

Untagged Port : Port-1 & Port-2

Tagged Port : Port-3

2. Create VLAN 3 Group

Add VLAN Group 3 with VID=3

Untagged Port : Port-4 & Port-5

Tagged Port : Port-6

3. Remove VLAN Member for VLAN 1:

Remember to remove the Port 1 – Port 6 from VLAN 1 membership, since the Port 1 – Port 6 had be assigned to VLAN 2

and VLAN 3.

Advertising
This manual is related to the following products: