3 installing the sfp transceiver – PLANET WGSW-28040P User Manual

Page 30

Advertising
background image

User’s Manual of WGSW-28040 / 28040P / 28040P4

30

Figure 2-11 Mounting Managed Switch in a Rack

Step6: Proceeds with the steps 4 and steps 5 of session 2.2.1 Desktop Installation to connect the network cabling and supply

power to the Managed Switch.

2.2.3 Installing the SFP transceiver

The sections describe how to insert an SFP transceiver into an SFP slot.

The SFP transceivers are hot-pluggable and hot-swappable. You can plug-in and out the transceiver to/from any SFP port

without having to power down the Managed Switch. As the

Figure 2-12

appears.

Figure 2-12 Plug-in the SFP transceiver

Advertising
This manual is related to the following products: