5 automatic operation timing chart, Operation – MITSUBISHI ELECTRIC MR-J2S- CP User Manual

Page 105

Advertising
background image

4 - 14

4. OPERATION


4.2.5 Automatic operation timing chart


The timing chart is shown below.

ON
OF

ON
OF
ON
OF

ON
OF

ON
OF
ON
OF

0r/min

ON
OF
ON
OF

2

1

ON
OF

1

2

Automatic/manual

selection (MD0)

Servo-on (SON)

Forward rotation

start (ST1)

Reverse rotation

start (ST2) (Note 1)

Point table No.

Servo motor speed

Forward
rotation

Reverse
rotation

In position (INP)

Rough match (CPO)

Movement finish

(MEND)

Point No. output

(PT0 to PT4)

Ready (RD)

Trouble (ALM)

Point table No. 1

(Note 2)
3ms or more

5ms or more

3ms or less

Point table No. 2

3ms or more

Note 1: Reverse rotation start (ST2) is invalid in the absolute value command system and absolute value command/incremental
value command specifying system.
2: External input signal detection delays by the input filter setting time of parameter No. 2. Also, make up a sequence
that will change the point table selection earlier by the time that takes into account the output signal sequence from
the controller and the variation of a signal change due to the hardware.

5ms or more

Advertising