Ecu power source inspection – Kawasaki STX-15F User Manual

Page 115

Advertising
background image

FUEL SYSTEM (DFI) 3-61

ECU

Check the ECU power source voltage with a tester [A].

Position the terminal in accordance with terminal numbers
of ECU connector [B] in this chapter figure.

ECU Power Source Inspection

Tester Connections:

2 (R/G) Terminal – Battery (−) Terminal
9 (R/W) Terminal – Battery (−) Terminal
28 (Y/R) Terminal – Battery (−) Terminal
30 (R/Y) Terminal – Battery (−) Terminal

Terminal Voltage:
Ignition Switch OFF:

2 (R/G) Terminal → Battery Voltage
9 (R/W) Terminal → 0 V
28 (Y/R) Terminal → 0 V
30 (R/Y) Terminal → 0 V

Ignition Switch ON:

2 (R/G) Terminal → Battery Voltage
9 (R/W) Terminal → Battery Voltage
28 (Y/R) Terminal → 0 V
30 (R/Y) Terminal → 0 V

Ignition Switch ON and Start Button ON:

All Terminals → Battery Voltage

Pushing the start button, run the engine 3

4 seconds.

Wait 15 seconds before using the starter again.
If the tester does not read as specified, check the follow-
ing:

Power Source Wiring (see wiring diagram below)
Main Fuse 20 A (see Electrical System chapter)
ECU Main Relay (see DFI Power Source section)
Ignition Switch (see Electrical System chapter)
Start Switch (see Electrical System chapter)

Advertising