Installation guidelines – GE Industrial Solutions AF-300C AC Drive User Manual

Page 29

Advertising
background image

AF-300C

GEK-85718

3. INSTALLATION GUIDELINES

INSTALLATION ENVIRONMENT

Install the inverter in a location that meets the follow-
ing requirements:

-- The ambient temperature is between -lCPC

and

to

-- The relative humidity is between 20% and 90%.

Avoid any location subject to dew condensa-
tion, freezing, or where the inverterwould come

in contact with water.

-- Do not install in any location subject to direct

sunlight, dust, corrosive gas, inflammable gas,
water vapor, or oil mist.

The inverter should be installed at an elevation

below 1000 meters (3281 feet) and vibration

should be less than

-- Motor wiring should be less than 66 feet. Oth-

erwise, wire seperation of 4 inches may be
required.

OPEN INSTALLATION MOUNTING
CLEARANCE

CAUTION:

Because the ambient temperature

affects inverter life and

do not install the

invetter in any location that exceeds the allowable

temperatures.

-- Install the inverter perpendicular to the ground

and with the lettering right side up. (If the
inverter is installed up-side-down or horizon-

tally, heat build-up will occur.)

-- Install at a sufficient distance from other equip-

ment, walls, or wiring ducts as shown in Figure

3-l (these clearances are required to allow for

proper cooling air circulation).

CAUTION:

Durinq operation, the tempera-

ture of the

fins of the inverter rise to

proximatelv 90

C (194 dearees

For

this reason, the mountinq wall must be of heat

resistant material.

NOTE: When installing two or more

in close proximity, allow sufficient space as
shown in Figure 3-1 and install them in a hori-

zontal row. If they must be installed in a

row,

spacemust be

provided between each one to prevent the

ambient temperature from rising.

-- See the appropriate view in Figure 33 for the

location of mounting holes.

-- Install the rubber bushings supplied with the

inverter into the cable openings in the wiring
lead-in plate to prevent cable damage and to
minimize dust entry.

4.8 inches

(120

mm)

4.8 inches

(120

mm)

4.8 inches

(120 mm)

4.8 inches

(120 mm)

3-1.

MOUNTING CLEARANCE

(Open Installation)