Primary domain controller – Agilent Technologies N2620A User Manual

Page 243

Advertising
background image

Network Performance Analyzer Reference

8

N2620A User’s Guide

225

Primary Domain Controller

A test is performed on the Primary Domain Controller (PDC)
that manages the security for its local domain.

Test setup

If Active Discovery does not detect the PDC-under-test, then it can
be manually added. The name or address of the PDC is typed in at
the first setup screen. The next setup screen provides a list of
measurements performed during the test. Select a measurement
from the list and press Edit to view and modify the thresholds
used to rate the performance of the measurement.

The following measurements are taken during the test.

Name Lookup

The request or response time for converting a name

into an address.

PING Response

The time taken to perform an ICMP Echo test on

the server.

Advertising