Agilent Technologies N2620A User Manual

Page 94

Advertising
background image

76

N2620A User’s Guide

2

Network Testing with the FrameScope Pro

5

Press Start to begin the test.

After pressing Start, the master FrameScope Pro starts the
activation and synchronization procedure with the target
FrameScope Pro by doing the following actions.

a

Search (if enabled) and check the status of the slave
FrameScope Pro.

b

Activate the slave FrameScope Pro if the device is in idle
mode.

c

Set up the slave FrameScope Pro parameters by
synchronizing the master and slave FrameScope Pro units
for the test.

d

Start the test.

e

Query test results at the end of the test.

f

Stop the test.

If the selected target is a loopback device, all test setups are
performed in the master FrameScope Pro. There will be no
authentication synchronization setup.

Advertising