2-10
Installation Standard Enclosure
1512A-UM102B-EN-P – June 2013
A T T E N T I O N
A T T E N T I O N
Ensure all barriers are replaced before re-
energizing the equipment. Failure to do so may
result in electrical faults and cause damage to
equipment or severe injury to personnel.
Front Access – Bottom Incoming Cables
If the incoming cables in your cabinet enter the section from the
bottom, follow the same procedure as for “Front Access – Top
Incoming Cables”.
1) Open the power cell doors.
Figure 2.9 – Access to Power Bus with Low Voltage Panel Rotated
Figure 2.10 – Power Bus with Barrier Removed
Access to the Power
Bus (cont.)