Rockwell Automation 1512A MV Controllers - 800A One-High Cabinet User Manual

Page 24

Advertising
background image

2-14

Installation Standard Enclosure

1512A-UM102B-EN-P – June 2013

Roof Plan

Front

Route cables through

access hole

Current Transformer

Figure 2.14 – Routing of Load Cables (Top exit shown)

A T T E N T I O N

A T T E N T I O N

Ensure all barriers are replaced before re-

energizing the equipment. Failure to do so may
result in electrical faults and cause damage to

equipment or serious injury to personnel.

Figure 2.15 – Load Cable Conduit Openings, Top Exit



Advertising