Rockwell Automation 1512A MV Controllers - 800A One-High Cabinet User Manual
Page 24
Advertising
2-14
Installation Standard Enclosure
1512A-UM102B-EN-P – June 2013
Roof Plan
Front
Route cables through
access hole
Current Transformer
Figure 2.14 – Routing of Load Cables (Top exit shown)
A T T E N T I O N
A T T E N T I O N
Ensure all barriers are replaced before re-
energizing the equipment. Failure to do so may
result in electrical faults and cause damage to
equipment or serious injury to personnel.
Figure 2.15 – Load Cable Conduit Openings, Top Exit
Advertising