Rockwell Automation 1512A MV Controllers - 800A One-High Cabinet User Manual

Page 90

Advertising
background image

B-8

ArcShield Plenum Installation Instructions

1512A-UM102B-EN-P – June 2013

Plenum Placement on Structure

Once the Plenum has been lifted in place directly over the relief vent,

(Shown in Figure B.7) all ¼ -20 fasteners, removed in “Cabinet
Preparation
” above, are replaced to attach the Plenum to the top of the

enclosure. Use hand tools only.

Use recommended

torque value for

¼-20 fasteners


Figure B.7 – Plenum Placement


NOTE: Use silicone caulking generously to fill any air gaps once the

Plenum has been securely mounted in place.


Advertising