Rockwell Automation 1512A MV Controllers - 800A One-High Cabinet User Manual

Page 91

Advertising
background image

ArcShield Plenum Installation Instructions B-9

1512A-UM102B-EN-P – June 2013


STEP 2 – Alignment of “Side-by-Side” Plenums


Plenums mounted side-by-side must be fastened together through the

aligning holes using 5/16” supplied hardware. (See figure B.8)

Figure B.8 – Aligning “Side-by-Side” Plenums


Any unused holes must be filled with thread

forming screws. i.e.: “Lifting Lug holes”

All Gaps must be sealed and filled with silicone.

I M P O R T A N T

I M P O R T A N T

Advertising