Installation – Arc Resistant (ArcShield) 3-7

1512A-UM102E-EN-P – June 2013

Note: Joining hardware can be found in a package mounted to the

front of the shipping skid. Refer to publication MV-QS050_-EN-P for

level floor surface requirements.

1) Remove the side bus access covers if applicable.
2) Position the left side section on a level surface and secure the

section in place with ½ in. (M12) floor mounting bolts (Refer to

Anchoring: ArcShield, page 3-5).

3) When joining ArcShield sections, apply a continuous 1/8-in.-(3-

mm) – wide bead of silicon sealer around the entire outer

perimeter of one section AND around the cutout for the power

bus.

4) Position the right section against the left section. Ensure that the

surface is level.

5) Secure the sections together using the ¼-20 self-tapping screws.

Thread the screw through the 0.281 in. clearance hole to the

corresponding 0.219 in. pilot hole. To access the front clearance

holes of the left-side cabinet, open the medium voltage doors. To

access the rear clearance holes remove the rer covers of the starter.

If rear access is not available, refer to Access to the power Bus –
Front Access, page 3-11.

6) Use the provided ¼-20 thread fasteners to secure the entire

perimeter of the horizontal bus. Ensure there is a continuous bead

of silicone seal around the bus bar opening on one cabinet.

7) Secure the right section to the floor using ½ in. (M12) floor

mounting bolts (refer to Anchoring, page 3-5).

Note: ArcShield units at the end of a line-up have a ground
connection to the outside side bus access cover (see Figures 3.9 and

3.10). This connection must be maintained to ensure unit arc resistant

performance.

Figure 3.5 – Joining Sections

Joining Sections