Rockwell Automation 1512A MV Controllers - 800A One-High Cabinet User Manual

Page 56

Advertising
background image

5-8

Maintenance

1512A-UM102B-EN-P – June 2013

BOLT-ON FUSE removal / installation

Tools required: 3/8-inch drive ratchet, 2-inch extension, 6-inch

extension, 12-inch extension, 1/2-inch socket, 3/8-inch drive torque

wrench.

Note: The fuse configuration will determine what length of extension

will be required to get at the mounting hardware. The fuse configuration

will also determine what size of interphase barriers are installed, the

lower barriers can be removed to provide better access to the fuse

mounting nuts.

1. Remove the two lower mounting nuts, lock and flat washers from

the mounting studs.

2. Remove the upper two mounting nuts, lock and flat washers from

the mounting studs and remove the fuse from the fuse mounting

studs.

3. Install the replacement fuse on the four mounting studs, hold the

fuse in place and install the upper two flat washers, lock washers

and nuts. Torque nuts to 12 ft.-lbs.

4. Install the lower two flat washers, lock washers and nuts. Torque

nuts to 12 ft.-lbs.

5. If interphase barriers were previously removed insure they are

properly reinstalled.

Contactor Maintenance

Refer to Medium Voltage Contactor, 800A, Publication

1502-UM051_-EN-P for contactor maintenance instructions.

Contactor Interlock Rod Adjust-

ment

Fuse Removal and

Replacement (cont.)

Advertising