Rockwell Automation 1512A MV Controllers - 800A One-High Cabinet User Manual
Page 39
Advertising
3-14
Installation – Arc Resistant (ArcShield)
1512A-UM102B-EN-P –June 2013
Figure 3.13 – Load Cable Conduit Openings, Arc Resistant Cabinet
(Bottom Exit cable configuration shown)
A T T E N T I O N
A T T E N T I O N
Ensure all barriers are replaced before re-
energizing the equipment. Failure to do so may
result in electrical faults and cause damage to
equipment or serious injury to personnel.
Advertising