2-12

Installation Standard Enclosure

1512A-UM102B-EN-P – June 2013

I M P O R T A N T

I M P O R T A N T

The current transformers may be positioned for top
or bottom cable exit. Follow the appropriate

procedure described for your starter configuration.

I M P O R T A N T

I M P O R T A N T

Cable size should not exceed 1-1000 MCM, 2-750

MCM, 3-500MCM or 4-500 MCM per phase.

Note: Refer to Dimensional Drawings provided with order
documentation for additional details related to cabinet floor plan.


1) Complete the Power Lockout procedure (see page 5-3).

2) Remove the appropriate cable conduit opening plate(s) from the

cabinet (see Figures 2.12 to 2.15). The plate may be punched or cut to

mount conduit.

3) Load cables for the power cell should be routed before control cables.

Pull the cables into the cabinet through the appropriate opening (see
Figures 2.12 to 2.15).

4) Remove current transformer barriers.

5) Connect the cables to the current transformers and tighten the

connections to 48 ft.lb (65 N.m).

6) Connect cable shields (if present) to the ground lug.

7) Reinstall the current transformer barrier and reassemble the cabinet.