Installation Standard Enclosure 2-11

1512A-UM102B-EN-P – June 2013

2) Locate incoming cable duct at rear left-hand side of power cell (see

Figure 2.11).

3) Remove self-tapping screws from the cable duct access barriers.

Remove barriers.

4) Route and install incoming line cables to power bus. Torque to

specifications (see page 1-3).

5) Reverse procedure after cables have been installed.

Bottom cable opening

A T T E N T I O N

A T T E N T I O N

Ensure all barriers are replaced before re-
energizing the equipment. Failure to do so may

result in electrical faults and cause damage to

equipment or severe injury to personnel.

A T T E N T I O N

A T T E N T I O N

To avoid shock hazards, lock out incoming power

(see page 5-3) before working on the equipment.

Verify with a hot stick or appropriate voltage

measuring device that all circuits are voltage free.
Failure to do so may result in severe burns, injury

or death.

Load Cable

Connections

Figure 2.11 – Access to Bottom Incoming

Cables