Common Installation 4-3

1512A-UM102B-EN-P – June 2013

Insulated Power Bus Splicing

If the starter is equipped with insulated power bus, then a splice kit with
insulated links, insulating boots and tape will be provided. Refer to the kit

for installation instructions.


Ground Bus


1) See Figure 4.3 to determine the correct ground splice configuration

and assemble as shown.

2) Torque the hardware to 12 ft·lb ± 1 ft.·lb (15 N·m ± 1 N·m).
3) Check all hardware for correct tightness and replace all covers and

plates.

Main

Ground Bus

Ground Bus

Support

Ground Bus

Splice Bar

Hex Nut

Lockwasher

Flat Washer

Main

Ground Bus

Ground Bus

Support

Ground Bus

Splice Bar

Hex Nut

Lockwasher

Flat Washer

Figure 4.3 – Typical Ground Bus Splicing Configuration (Front View)

A T T E N T I O N

A T T E N T I O N

Ensure all barriers are replaced before
reenergizing the equipment. Failure to do so may

result in electrical faults and cause damage to

equipment or severe injury to personnel.