Chapter 5 Programming

5.6.12.8 Totalize

The totalize calculation keeps a running total of the value of a point sampled at a programmed rate. This
will continue until the programmed reset interval time is reached at which time the value is logged on the
alarm/event log window (if reset print is enabled), is reset to zero, and the Totalization calculation begins
again. However, a low-flow cutoff provision prevents totalization on flow rates that meet or fall below the
cutoff point. The data will also be recorded to disk if alarm/event logging is enabled. The totals are non-
volatile for channels A through C unless auto reset is active.
The Point Setup menu for Totalize will
be displayed and may require programming the following parameters:

Point Tag

Section 5.6.5.1

Decimal fix

Section 5.6.5.4

Basepoint

Section 5.6.5.12

Flowrate

Section 5.6.5.16

Engineering Units

Section 5.6.5.9

Reset Control

Section 5.6.5.13

Low Cutoff

Section 5.6.5.17

Alarm Setpoint

Section 5.6.5.10

Chart Scale

Section 5.6.5.11

5.6.13 Conditional Point Types

These point types are used when the operator needs to set a list of operating conditions for a point.

Operators Used for Setting Conditions - Forty operators are allowed in any one formula programmed. If the
conditions equation does not compute, the display will read “bad operand”. The following operators are used:

P1 to PF

are used to represent Points (Must be pre programmed)

K1 to KF

are used to represent Constants (Must be pre programmed)

)

is a RIGHT Parenthesis

|

is or

&

is and

<

is less than

>

is greater than

=

is equal to

!=

is not equal to

<=

is less than or equal to

>=

is greater than or equal to

!

is not

(

is a LEFT Parenthesis

The Point Setup menu for Conditional Points will be displayed and may require programming the following
parameters:

Point Tag

Section 5.6.5.1

Set Cndtionl

Section 5.6.5.19

Engineering Units

Section 5.6.5.9

Alarm Setpoint

Section 5.6.5.10

Chart Scale

Section 5.6.5.11