ADS Environmental Services FlowAlert QR 775011 A2 User Manual

Page 162

Advertising
background image

6-10

ADS FlowAlert Manual

Positioning the nuts on the stud to receive the mounting bracket

11. Mount the bottom of the mounting bracket onto the monitor

flange with two 3/8-inch x 1-inch hex bolts, 3/8 – 16 nex nuts,
and 3/8-inch washers. It may be necessary to drill new holes in
the flange.

Bolting the mounting bracket to the flange welded to the monitor

12. Carefully lower the monitor into the manhole, and place the

keyhole in the bracket over the outer nut on the stud.

Advertising