ADS Environmental Services FlowAlert QR 775011 A2 User Manual

Page 82

Advertising
background image

4-14

ADS FlowAlert Manual

13. Install the dome onto the base by sliding the dome over the

bracket and base and then aligning the metal pins in the base
with the cutouts on the bottom edge of the dome. Once the
dome is seated in the cutouts, turn it to lock it into place.

Sliding the dome over the bracket and base

14. Connect the SMA connector at the end of the antenna cable to

the TELEMETRY/ANTENNA connector port on top of the
monitor.

Advertising