ADS Environmental Services FlowAlert QR 775011 A2 User Manual

Page 49

Advertising
background image

3-26

ADS FlowAlert Manual

12. Make sure the band and sensor are flush against the pipe wall

with no gaps, and conform the rest of the band to the pipe wall.

13. Install ¼-inch x 2 ¼-inch anchor bolts, nuts, and washers at the

pre-drilled hole at the short end of the band and at the pre-
drilled holes along the long end of the band (above the flow
surface) approximately every 12 to 24 inches to the top end of
the band.

Note: Whenever possible, secure the band with an
additional anchor bolt approximately 3 inches below the
flow surface on each side of the pipe. This will help
ensure that the band remains flush against the bottom of
the pipe below the flow surface.

Sensors mounted using a ¾-band mount in the pipe with and without silt

14. Measure the physical offset for the pressure depth sensor (i.e.,

the vertical distance from the bottom of the pressure depth
sensor to the bottom, center of the pipe).

Note: This value will be necessary when configuring the
monitor using the Profile software.

15. Run the sensor cable from the sensor location in the pipe to the

monitor location in the manhole according to the instructions
on page 3-36.

Advertising