Pressure Depth Sensor and Float Switch Installation 3-25

above the silt level and below the flow surface during minimum
flows.

 If silt is not present, locate the sensor on the band so it will

be at the bottom center of the pipe once installed.

 If silt is present, locate the sensor slightly up the long end

of the band so it will be above the silt level once installed.

4. Mount the sensor onto the inside of the band with two 4-40 x

5/16-inch

countersink screws, making sure the pointed end of

the sensor faces the upstream edge of the ring (edge opposite
cable tie holes). If holes do not exist on the band at or near the
desired mounting location for the sensor or the sensor does not
have screw inserts, use two medium-sized cable ties to secure
the sensor to the ring. Crisscross the cable ties across the top of
the sensor and underneath the band.

5. Secure the sensor cable along the downstream edge of the long

end of the band according to the instructions on page 3-29.

6. Position the band in the pipe so that the sensor will remain

below the flow surface (even during minimum flows) and
above the silt level.

7. Make sure two pre-drilled holes are visible above the flow

surface on the short end of the band. Maneuver the band so
that the lowest hole is almost at the flow surface.

8. Mark the pipe wall through the lowest hole with a drill, and

install a ¼-inch x 2 ¼-inch anchor bolt with a pneumatic drill.

9. Secure the band to the anchor bolt with a washer and nut.

10. Conform the band to the pipe wall around to the long end of the

band so that it is flush with the pipe wall.

Note: Temporarily remove any silt preventing the band
from sitting flush against the bottom of the pipe.

11. Install a ¼-inch x 2 ¼-inch anchor bolt through the pre-drilled

hole closest to the flow surface on the long end of the band, and
secure the band with a washer and nut.