ADS Environmental Services FlowAlert QR 775011 A2 User Manual

Page 201

Advertising
background image

In-6

ADS FlowAlert Manual

monitor configuration, 5-2

creating a monitor location, 5-4
creating an installation table, 5-6
editing the float device, 5-13
editing the notification device,

5-18

editing the pressure device, 5-15
editing the RSSI device, 5-19
selecting devices, 5-11

N

network interface box

connecting wires from lightning

protection module, 4-32

inspection, 7-10

O

on-site communication

using the direct connection cable,

4-35

P

part numbers

battery pack, B-1
board, B-1
cables, B-1
float switch, B-1
monitor, B-1
pressure depth sensor, B-1

pipe conditions, 3-4
pipe table, 5-6
port selection, 5-20
power, 2-8

battery pack replacement, 7-6
checking battery voltage, 7-4

pressure depth sensor, 2-9

description and operation, 2-9
editing the pressure device in

Profile, 5-15

inspection, 7-9

installation, 3-6
mounting to band, 3-23
mounting to ring, 3-16
part numbers, B-1
replacing the dryer tube, 7-9
ring assembly, 3-8
running diagnostics, 5-32
securing cable in manhole, 3-36
securing cable to the band, 3-29
securing cable to the ring, 3-17
securing the dryer tube to the

monitor, 3-45

special installation, 3-20

1/2-band mount, 3-27
3/4-band mount, 3-24

specifications, A-4
standard installation, 3-6
troubleshooting, 7-20
wall installation, 3-31

processor, 2-5
Profile

activating the monitor, 5-24
collecting data from the monitor,

5-37

configuring the power savings

parameters, 5-27

editing the RSSI device, 5-19
launching the software, 5-2
running diagnostics on device,

5-32

setting communication parameters,

5-20

upgrading the monitor firmware,

5-44

viewing logs, 5-47

R

remote communication

installing a SIM card, 4-17
setting up land line

communication, 4-22

setting up wireless

communication, 4-2

Advertising