ADS Environmental Services FlowAlert QR 775011 A2 User Manual

Page 199

Advertising
background image

In-4

ADS FlowAlert Manual

wiring telephone cable to

lightning protection module,
4-30

monitor, 6-1

mounting to a manhole ladder

rung, 6-12

mounting to the manhole rim,

6-6

mounting to the manhole wall,

6-3

mounting sensor to band, 3-23
mounting sensor to ring, 3-16
mounting sensor to strap, 3-31
mounting sensor to wall, 3-31
pressure depth sensor, 3-6, 3-24,

3-27
securing cable to band, 3-29

ring, 3-8, 3-18
securing sensor cable in manhole,

3-36

sensor

ring assembly, 3-8

special, 3-20

1/2-band mount, 3-27
3/4-band mount, 3-24
securing sensor cable to band,

3-29

standard, 3-6
telephone service, 4-22

mounting lightning protection

module, 4-25

preparing telephone cable,

4-26

running cable between monitor

and service locations, 4-23

wiring lightning protection

module to network interface
box, 4-32

wiring telephone cable to

lightning protection module,
4-30

wiring telephone cable to

monitor, 4-28

wireless antenna in a pedestal,

4-9

wireless antenna in the road, 4-3
wireless antenna on a roof or other

protected structure, 4-16

wireless communication, 4-2

SIM card, 4-17

installation table, 5-6
IP address

obtaining address from monitor,

7-4

L

landline communication, 2-6, 2-7

installation, 4-22

preparing telephone cable,

4-26

running cable between monitor

and service locations, 4-23

wiring lightning protection

module to network interface
box, 4-32

wiring telephone cable to

lightning protection module,
4-30

wiring telephone cable to

monitor, 4-28

mounting lightning protection

module, 4-25

troubleshooting, 7-16

launching the Profile software, 5-2
lightning protection module

connecting telephone cable, 4-30
connecting wires to network

interface box, 4-32

inspection, 7-10
installing the ground rod, 4-25
mounting, 4-25
specifications, A-6

logs, 5-47

Advertising