ADS Environmental Services FlowAlert QR 775011 A2 User Manual

Page 33

Advertising
background image

3-10

ADS FlowAlert Manual

3. Slide the ring stabilizer all the way around the ring until it is

about 4 inches from the welded metal band at the other end of
the ring.

Moving the ring stabilizer into position

4. Position the ring with the downstream edge (edge with the

holes) facing you.

Note: Steps 5 and 6 apply only to overlapping rings.
Proceed directly to step 7 for non-overlapping rings.

5. Slide the open end of the ring through the slot in the welded

band of the ring until it overlaps about 4 inches.

6. Spread the ring sections apart so that you can slide the ring

stabilizer with the spreader mechanism screw into the gap.

Advertising