Start Sequence – Continued

Figure 3-6: Air/Fuel Valve In Ignition Position

6. Up to 4 seconds will be allowed for ignition to be detected. The igniter relay will be turned

off one second after flame is detected.

7. After 2 seconds of continuous flame, Flame Proven will be displayed and the flame strength

will be indicated. After 5 seconds, the current date and time will be displayed in place of the
flame strength.

8. With the unit firing properly, it will be controlled by the temperature controller circuitry. The

heater’s VALVE POSITION will be continuously displayed on the front panel bar-graph.

9. Once the demand for hot water has been satisfied, the Control Box will turn off the SSOV

gas valve. The blower relay will be deactivated and the Air/Fuel Valve will be closed.
Standby will be displayed.