AERCO RECON 1000 User Manual

Page 9

Advertising
background image

RECON Water Heaters Installation, Operation & Maintenance Manual

FORWARD

OMM-0103_0A

AERCO International, Inc.

 100 Oritani Dr.  Blauvelt, NY 10913

Page 9 of 178

GF-147

Phone: 800-526-0288 PRI:

10/28/2014

Phrases, abbreviations and acronyms used in this manual are listed in the following Table:

Phrases, Abbreviations and Acronyms

Phrase, Abbreviation

or Acronym

Meaning

A (Amp)

Ampere

ADDR Address
AGND Analog

Ground

ALRM Alarm
ASME

American Society of Mechanical Engineers

AUX

Auxiliary

BAS

Building Automation System, often used interchangeably with EMS
(see below)

Baud Rate

Symbol rate, or simply the number of distinct symbol changes
(signaling events) transmitted per second. It is not equal to bits per
second, unless each symbol is 1 bit long.

BLDG (Bldg)

Building

BTU

British Thermal Unit. A unit of energy approximately equal to the heat
required to raise 1 pound of water 1°F.

CCP

Combustion Control Panel

C-More Controller
(or Control Box)

A control system developed by AERCO and currently used in all
Benchmark, RECON and KC1000 Series product lines.

CO Carbon

Monoxide

COMM (Comm)

Communication

Cal. Calibration
CNTL Control

DBB

Double Block & Bleed. Used to define gas trains containing two
SSOVs and a solenoid operated vent valve. Used interchangeably
with IRI.

DIP

Dual In-Line Package

EMS

Energy Management System; often used interchangeably with BAS

FM

Factory Mutual. Used to define boiler gas trains.

GND Ground
HDR Header
HX Heat

Exchanger

Hz

Hertz (Cycles Per Second)

I.D. Inside

Diameter

IGN Ignition
IGST Board

Ignition/Stepper Board contained in C-More

Control

Box

INTLK (INTL’K)

Interlock

I/O Input/Output



Advertising
This manual is related to the following products: