Honeywell HERCULINE 2000 User Manual

Page 29

Advertising
background image

Installation

Electrical Installation

Revision 7

HercuLine™ 2000 Series Actuator - Installation, Operation and Maintenance Manual

21

7/08

Power Connections

Depending on which power supply selection is ordered for your actuator, wire the power input (MAINS
POWER) as described in the previous tables and figures. Wiring must conform to national and local electrical
codes.

CE Wiring

When wiring the actuator power input for CE approved units, you must also install a MOV and ferrite beads
supplied with the CE unit.

You need the following tools:

5mm hex key

small flat blade screwdriver

small needle nose pliers

While the unit is powered, a potentially lethal shock hazard exists inside the case.
Do not open the case while the unit is powered. Do not access the terminals while
the unit is powered.

Step

Action

1

Remove AC power to actuator.

2

Loosen the 6 captive screws (use 5mm hex key) and remove the cover.

3

Locate the terminals TB1-1, TB1-2 and ground screw.

4

Loosen the screws at terminals TB1-1 and TB1-2. Remove screw used for ground.

5

Install the appropriate MOV assembly as shown in Figure 11.

6

All ferrites require 1 loop of wire per ferrite. Connect as shown in following steps.

7

Current input and output (slidewire emulation) connection

Communications and digital input connection

TB1-2

TB1-1

Ground
screw

Communications
and digital input

Current input
and output
(slidewire
emulation)

Figure 11 CE wiring part 1

Advertising