Honeywell HERCULINE 2000 User Manual

Page 30

Advertising
background image

Installation
Electrical Installation

22

HercuLine™ 2000 Series Actuator - Installation, Operation and Maintenance Manual

Revision 7

7/08

Step

Action

8

AC power connection

Auxiliary switches connection

Relay contact connection

Relays 3 and 4

Relays 1 and 2

Aux switches
1 and 2
(SW3 and SW4)

Aux switches 3
and 4
(SW5 and SW6)

AC power
connection

Figure 12 CE Wiring part 2

9

Install new gasket and top cover. Secure top cover with 6 captive screws.

10

Reapply AC power to the actuator.

11

Actuator is ready for use.

Input Signal Connections

ATTENTION

Shielded and grounded cables are recommended.

0/4-20 mA Input Signals

For current signal input, ensure jumper W2 on the CPU PWA is in the “Current” position. See Figure 27 on
page 68. Observing polarity, connect the signal input wires TB3–4(+) and TB3–5(-) on CPU terminal board.

0/1-5 Vdc and 0 to 10 Vdc Input Signals

For voltage signal input, ensure jumper W2 on the CPU PWA is in the “Voltage” position. See Figure 27 on
page 68. Observing polarity, connect the signal input wires to terminals TB3–4(+) and TB3–5(-) of the terminal
block.