Plumbing connections, Transfer tubing installation, Plumbing connections -7 – Gilson 215 User Manual

Page 23: Transfer tubing installation -7

Advertising
background image

2-7

Installation

2

Plumbing Connections

Plumbing Connections

Transfer Tubing Installation

1 Connect one end of each piece of transfer

tubing to the 444 QuadDilutor. Refer to the 444

QuadDilutor User’s Guide for more information.

2 Locate the level sensing cables (LLD cables)

supplied with the Z-arm.

3 Pass the other end of each transfer tubing

through the open end of an LLD cable casing

nearest the right-angle connector. The tubing

should exit the back of the LLD cable casing

approximately 6.5 cm from the end.

4 Connect each tubing to the top of the isolation

probe holder using a 1/4"-28 nut and ferrule

supplied with the tubing. Firmly tighten this

fitting using the supplied headless nut extender

(part number 49041032) since it holds the probe

in place.

Advertising