Gilson 215 User Manual

Page 68

Advertising
background image

4-12

Maintenance

4

Installing the new level sensing cable

1 Locate the new level sensing cable supplied

with the Z-arm.

2 Pass the transfer tubing through the open end

of an LLD cable casing nearest the right-angle

connector. The tubing should exit the back of

the LLD cable casing approximately 6.5 cm

from the end.

3 Connect the transfer tubing to the top of the

isolation probe holder using a 1/4"-28 nut and

ferrule supplied with the tubing. Firmly tighten

this fitting using the supplied headless nut

extender (part number 49041032) since it holds

the probe in place.

4 Plug the right-angle connector on one end of the

cable into socket one on the back of the Z-arm.

5 Pass the cable through the LLD cable guide.

6 Attach the split-tongue connector to the small

hexagonal nut on the probe holder. Tighten the

nut until snug (approximately one turn after

finger-tightening).

Replacing Parts

Advertising