Energized parts charts – Manitowoc Ice FLAKE/CHIPLET QF0400 User Manual

Page 64

Advertising
background image

Electrical System

Section 6

6-2

Part No. 80-1214-3

Energized Parts Charts

QF2200

*After the liquid line solenoid valve energizes, the suction pressure will rise above the low-pressure switch cut-in (22 psig) and the compressor and

condenser fan motor energize. The condenser fan motor remains energized during the entire freeze cycle, the head pressure control valve con-
trols the discharge pressure.

When the toggle switch is placed in the ICE position, the following must occur prior to starting an ice making cycle.
A.)The bin level probe must be open (Bin Level light off). If the probe is closed (Bin Level light on) when the toggle switch is moved to ICE, the

control system waits until the bin level probe opens (Bin Level light off) before starting an ice making sequence.
If the bin level probe is disconnected from the control board, the ice machine will not start and will continuously flash the Bin Level light.
The ice machine will remain off until:
1.The bin level probe is reconnected to the circuit board
2.The toggle switch is moved from ICE to OFF, then back to ICE.

B. The water level probe must be closed (Water Level light on) to start the compressor.

If the water level probe is open (Water Level light off), the control system waits until the water level probe closes before starting the compressor.

8-Minute Lockout - The Bin Level light will flash until the 8-minute lockout expires.
After the 8-minute lockout expires, the Bin Level light will de-energize.
The 8-minute lockout time can be overridden by moving the ICE/OFF/CLEAN toggle switch from ICE to OFF, then back to ICE.

Ice Making

Sequence

Of

Operation

Control Relays

Sensors

Length

Of Time

1

2

3

4

Water

Level

Probe

Bin Level

Probe

Temperature

Sensor

Gear

Motor

Speed

Liquid Line

Solenoid

Valve

Dump

Valve

Gear

Motor

Float

Valve

Coil

START-UP

1A. Water

Flush

Off

On

On

Off

Not

Sensing for

Water Level

Sensing No

Ice Contact

Not Sensing

for

Temperature

Sensing
for Gear

Motor

Speed

45 Seconds

1B. Water

Fill

Off

Off

On

On

Sensing for

Water Level

Sensing No

Ice Contact

Not Sensing

for

Temperature

Sensing
for Gear

Motor

Speed

Until Water

Contacts

Water Level

Probe

FREEZE

SEQUENCE

2. Freeze

On

Off

On

On

Sensing for

Water Level

Sensing No

Ice Contact

Sensing for

123

°

F

Immediately.

Sensing for

30

°

F after 30

min. of Ice

Making

Sensing
for Gear

Motor

Speed

Until Ice

Contacts Bin

Level Probe

for 30

Continuous

Seconds

AUTOMATIC

SHUT-OFF

3A. Ice Run

Out

Off

Off

On

On

Sensing for

Water Level

Sensing

Ice Contact

Not Sensing

for

Temperature

Sensing
for Gear

Motor

Speed

4 Minutes

3B. Drain

Evaporator

Off

On

Off

Off

Not

Sensing for

Water Level

Sensing

Ice Contact

Not Sensing

for

Temperature

Not

Sensing
for Gear

Motor

Speed

90 Seconds

AUTOMATIC

SHUT-OFF

Off

Off

Off

Off

Not

Sensing for

Water Level

Sensing

Ice Contact

Not Sensing

for

Temperature

Not

Sensing
for Gear

Motor

Speed

Until Ice No

Longer

Contacts Bin

Level Probe

Revised 8/2003

Advertising
This manual is related to the following products: