Wiring diagram sequence of operation – Manitowoc Ice FLAKE/CHIPLET QF0400 User Manual

Page 66

Advertising
background image

Electrical System

Section 6

6-4

Part No. 80-1214-3

Wiring Diagram Sequence of
Operation

QF400

Initial Start-Up or Start-Up After
Automatic Shut-Off

1A. WATER FLUSH

Immediately after placing the toggle
switch in “ICE”, the dump valve
solenoid, and gearbox are energized.
After 45 seconds the dump valve de-
energizes.

RELAY

K1

SV3033

GROUND

L1

L2 (N)

(21)

(65)

CONTACTOR

COIL

(90)

HIGH

PRESSURE

CUT-OUT

(95)

RELAY

K2

RELAY

K3

RELAY K4

(25)

10 AMP

FUSE

(46)

GEARMOTOR

(47)

GEARMOTOR

RUN CAPACITOR

(48)

(43)

(56)

WATER FLOAT

VALVE COIL

(52)

(22)

(55)

(51)

DUMP VALVE

COIL

FAN MOTOR

(AIR-COOLED ONLY)

(10)

(11)

(14)

(41)

CONTACTOR

CONTACTS

L1

T1

RUN

START

(44)

1A. Water Flush (45 Seconds)

Toggle Switch

ICE

Bin Level Probe

Open (No Ice Contact)

Control Board Relays

#1

Contactor Coil

Open / OFF

Compressor

OFF

Condenser Fan Motor

OFF

#2

Dump Valve

ON

#3

Gear Motor

ON

#4

Water Float Valve Solenoid Coil

OFF

Revised 8/2003

Advertising
This manual is related to the following products: