Wiring Diagram Sequence of
Operation

QF2200

Initial Start-Up or Start-Up After
Automatic Shut-Off

1A. WATER FLUSH

Immediately after placing the toggle
switch in “ICE”, the dump valve
solenoid, and gearbox are energized.
After 45 seconds the dump valve de-
energizes.

SV3043

RELAY

K1

RELAY

K2

RELAY

K3

RELAY K4

(25)

L1

L2

(54)

(53)

LIQUID LINE

SOLENOID

CENTRIFUGAL

SWITCH

(65)

INTERNAL

OVERLOAD

START

RUN

GEARMOTOR

WATER FLOAT

VALVE COIL

DUMP VALVE

COIL

(56)

(55)

(22)

(51)

(52)

7 AMP

FUSE

GROUND

1A. Water Flush (45 Seconds)

Toggle Switch

ICE

Bin Level Probe

Open (No Ice Contact)

Control Board Relays

#1

Liquid Line Solenoid Valve

OFF

#2

Dump Valve

ON

#3

Gear Motor

ON

#4

Water Float Valve Solenoid Coil

OFF

Revised 8/2003