Input, A---b---c phase rotation required – Powerware 5075 kVA User Manual

Page 134

Advertising
background image

NOTE:

Callout letter

and

map to drawing #164201261---3

,

, ,

DESCRIPTION:

DATE:

DRAWING NO:

1 of 11

INSTALLATION NOTES

SHEET:

REVISION: F

111503

164201261---1

A---2

Powerware BPIII Harsh Environment UPS 50--75 kV Installation and Operation

164291261 Rev. F 111503

Table A.

INPUT

Ratings & External Wiring Requirements for

Powerware BPIII HE 50---75 kVA (208, 480, and 600 Volt)

Ratings

Units

Rating 60 Hz

Basic unit rating at

0.8 lagging PF load

KVA

KW

50

40

62.5

50

75

60

gg g

INPUT

VOLTAGE

208

480

600

208

480

600

208

480

600

A

C

I

N

AC Input to UPS Rectifier

Full Load

Full Load + Batt. Chg.(max)

(.95min.PF)

3  , (1) gnd

Amps

(Nom)

Amps (Max)

180

230

60

100

50

80

220

275

90

120

70

96

260

320

110

140

80

115

N

P

U

T

Minimum conductor size

(number per  )

AWG or

kcmil(ea)

3/0

(2)

1/0

(1)

2

(1)

3/0

(2)

2/0

(1)

1

(1)

4/0

(2)

3/0

(1)

2/0

(1)

A

C

AC Input to Bypass

Full Load Current

 

INPUT

VOLTAGE

208

480

208

208

480

208

208

480

208

C

I

N

P

3  , (1) gnd

Minimum conductor size

(number per  )

Amps (Nom) 139

60

139

173

75

173

208

90

208

P

U

T

(number per  )

AWG or

kcmil(ea)

3/0

(1)

4

(1)

3/0

(1)

350

(1)

2

(1)

350

(1)

350

(1)

1

(1)

350

(1)

D

C

I

N

P

DC Input from Battery to UPS

(1) positive, (1) negative

VDC

Float VDC

Amps

(2.0V/cell)

120

135

360

120

135

360

120

135

360

120

135

455

120

135

455

120

135

455

120

135

545

120

135

545

120

135

545

P

U

T

Minimum conductor size

(number per pole)

AWG or

kcmil(ea)

3/0

(3)

3/0

(3)

3/0

(3)

250

(3)

250

(3)

250

(3)

350

(3)

350

(3)

350

(3)

Read and understand the following notes while planning your installation:

1.

Refer to national and local electrical codes for acceptable external wiring practices.

2.

Material and labor for external wiring requirements are to be provided by designated

personnel.

3.

For external wiring requirements, including the minimum AWG size of external wiring, see

the appropriate column in Tables A throuigh C. The power wiring for this equipment is

rated at 90˚C.

4.

Critical load power to be run in separate conduits, busways, or cabletrays and sufficiently

separated from source power.

5.

System to be grounded to single point local or utility ground.

6.

A---B---C phase rotation required.

Advertising