Powerware 5075 kVA User Manual

Page 40

Advertising
background image

32

Powerware BPIII Harsh Environment UPS 50--75 kV Installation and Operation

164291261 Rev. F 111503

4.

Connect RIM wiring to the terminal block using the terminations shown in

Table E.

5.

Contact your local field service office for verification and testing of the RIM

and its connections prior to making connections with J1---J4.
You can order interface cables separately for connecting to the 15-Pin D-Sub

Connectors.

6.

Repeat steps 1 through 5 for each RIM you are installing.

7.

If you are installing an RMP or SCM in addition to an RIM, proceed to Chapter

4 or 6, respectively; otherwise, secure the UPS cabinet by reversing the steps

contained in procedure “To Prepare the UPS for Wiring to an RMP, RIM, SCM,

or Remote EPO” of Chapter 2.

Table E. RIM Wire Terminations

From RIM A

To UPS

Remarks

TB1---4

TB3---1

TWISTED WIRES (4)

TB1---5

TB3---2

TWISTED WIRES (4)

1---2 TURNS PER

TB1---6

TB3---3

1 2 TURNS PER

3 INCHES

TB1---7

TB3---4

From RIM B (if used)

To UPS

Remarks

TB1---4

TB3---5

TWISTED WIRES (4)

TB1---5

TB3---6

TWISTED WIRES (4)

1---2 TURNS PER

TB1---6

TB3---7

1 2 TURNS PER

3 INCHES

TB1---7

TB3---8

Advertising