Nortel Networks DCT1900 User Manual

Page 172

Advertising
background image

Technical Product Manual - DCT1900

Installation Instructions, or BDVNB 101 01/3

4-18

Install-DCT1900/R8/mw

© 2000-2005

Testing and back up

z

Verify that all existing portables are working.

z

Verify that all existing base stations are working.

Now is the time to add any connections to LTU/SLU/CLU/DTU boards or to move any boards that
you have decided to move. Which you do first depends on what you are doing and it is up to you
to decide the order of these operations.

z

Add or move any boards.

z

Add or move any cables and 66 blocks.

z

Label or re-label the 66 blocks.

z

When you are done adding or moving things, DO a system back up. Give it a new name.

z

Put the card retention bar on the cabinet.

z

Put the bottom plate back on the cabinet.

z

Place the front cover on the cabinet and secure it.

Advertising