Nortel Networks DCT1900 User Manual

Page 233

Advertising
background image

Technical Product Manual - DCT1900

Installation Instructions, Base Station – KRC 101 1371

Install-DCT1900/R8/mw

16-11

© 2000-2005

Mounting Technique

Fig. 16-10 Mounting to Factory Ceiling

The chain is to be used as two continuous pieces. Loop the chains around the I Beam and connect
them to the screw eyes with the Quick Links. (See Figure 16-10.)

Always use right angle antennas.

Once the Base Station is mounted and the cable is connected to the base station, make sure that
the Base Station cable is tie wrapped to one of the chains. This acts as a retention device so that
the Base Station does not slide off of the mounting bracket.

See Figure 16-11 for screw mounting dimensions.

1:

2:

3:

4:

5:

6:

7:

Small link chain, white or unpainted depending on ceiling
color. Purchased at Home Depot (or similar store).
TYPICAL (2) 6 foot lengths.

1/8" Quick Link. Manufacturer - Campbell, p.n. 764-5106,
quantity of 4. Purchased at Home Depot.

#8 Screw Eye - Quantity of 4. Purchased at Home Depot.

5.5" x5" piece of 3/4" thick Melamine. Purchased at Home
Depot and cut to size.

DCT1900 Base Station - DPY 102 162.

DCT1900 Right Angle Antenna Set - KRE 101 1750/55 -
quantity of 1.

Base Station cable connected to RJ45.

1

2

3

4

5

6

7

DB600-001

Advertising