Chapter 8, 1 general, 2 board description – Nortel Networks DCT1900 User Manual

Page 195

Advertising
background image

Technical Product Manual - DCT1900

Installation Instructions, Cell Link Unit (CLU-S) –REX-BRD0016 or ROFNB 157 16/2

Install-DCT1900/R8/mw

8-1

© 2000-2005

C

HAPTER

8

Cell Link Unit (CLU-S) –REX-BRD0016 or ROFNB 157 16/2

8.1

General

The CLU-S is used to control up to 8 Base Stations via twisted pair cables with a maximum length
of 1.3 miles.

Maintenance
The CLU-S contains the following field–exchangeable part (see Figure 8–1):

z

CLU Firmware, Board Controller - RYSNB 101 19

8.2

Board Description

Straps
Not applicable.

Connectors
The CLU has 4 connectors at the front by which the CLCs are connected to the Base Stations and
1 connector for input of the Base Station power:

CLC 1–8

: To connect Base Station 1 to 8.

Base Station Power

: To connect -48 Volts from the MCCB for powering the Base

Stations.

The power connector does not have a polarity. It makes no difference which pin becomes plus or
minus.

LEDs
LED1

Green

: Normally on. Power On LED

LED2

Red

: Normally off. Watch–dog LED

LED3

Red

: Normally off. Board not polled LED

LED4

Red

: Normally off. Base Station in NEW state or board error

Advertising